Post Processing
Finishing Parts
Post Processing
Estimated print time is longer than normal
Boiling parts
Some materials require boiling after post-curing.
Boiling reduces surface tack and helps achieve optimal physical properties.
To check whether the material requires this step, refer to the material Instructions For Use (IFU).
- Place parts in fresh drinking water for 60 minutes
- Remove parts with a set of tongs
- Allow to cool