Post Processing

Estimated print time is longer than normal

Boiling parts

Some materials require boiling after post-curing.
Boiling reduces surface tack and helps achieve optimal physical properties.

To check whether the material requires this step, refer to the material Instructions For Use (IFU).

  • Place parts in fresh drinking water for 60 minutes
  • Remove parts with a set of tongs
  • Allow to cool